2.5.3.0 Scheduler Tasks resets their times
Posted: 19 Jun 2010 16:30
Since upgrading to the new 2.5.3.0, i have created two schduler jobs, because the scheduler is totally different in this version.
One to start at 7am to reduce bandwidth to 75% and one to start 11pm to go back to full bandwidth. They do work, but unfortunately lets say i turn my PC on at 9:30am the 7am job does work, but will change its next run time to 9:30am, therefore if i turn the PC on at 6:30am the next morning the job will not work until 9:30am.
Is there are any way to stop the jobs changing their time?
One to start at 7am to reduce bandwidth to 75% and one to start 11pm to go back to full bandwidth. They do work, but unfortunately lets say i turn my PC on at 9:30am the 7am job does work, but will change its next run time to 9:30am, therefore if i turn the PC on at 6:30am the next morning the job will not work until 9:30am.
Is there are any way to stop the jobs changing their time?